Decision details
Breach of Condition Notice for St Johns Garden Centre 14097
Decision Maker: Service Manager, Development Management Team
Decision status: Recommendations Approved
Is Key decision?: No
Is subject to call in?: No
Decision:
Agreement to issue Breach of Condition Notice
for St Johns Garden Centre, Roundswell, Barnstaple, Devon, EX31
3FA
Reasons for the decision:
1.1. The development has not been carried out
in accordance with the approved condition.
1.2. Works have commenced on site and the following
pre-commencement conditions have not been discharged required under
application 77276:
Condition 25 - Save for the installation of the access and estate
road (as set out in drawing number 1943 2 REV B) no other
development shall commence until the following information has been
submitted to and approved in writing by the Local Planning
Authority:
(b) Detailed proposals for the management of surface water and silt
runoff from the site during construction of the development hereby
permitted.
(c) Proposals for the adoption and maintenance of the permanent
surface water drainage system.
1.3. This condition has been imposed to ensure the proposed surface
water drainage system will operate effectively and will not cause
an increase in flood risk either on the site, adjacent land or
downstream in line with SuDS for Devon Guidance (2017) and national
policies, including NPPF and PPG .The condition should be
adequately discharged pre to commencement of works since it is
essential that the proposed surface water drainage system is shown
to be feasible before works begin to avoid redesign / unnecessary
delays during construction when site layout is fixed.
1.4. It is therefore expedient to proceed to issue the BCN on the
basis of the following. The relevant planning permission to which
this Notice relates is the planning permission reference ref 77276
granted by the Council on 14 December 2023.
1.5. The requirements of this condition have not been met as
detailed proposals for the management of surface water and silt
runoff from the site during construction of the development hereby
permitted and proposals for the adoption and maintenance of the
permanent surface water drainage system have not been submitted or
approved.
1.6. The requirements of the Notice will be to submit the following
information:
(b) Detailed proposals for the management of surface water and silt
runoff from the site during construction of the development hereby
permitted.
(c) Proposals for the adoption and maintenance of the permanent
surface water drainage system within a period of 30 days.
Alternative options considered:
3.1. There are no other actions the Council
can take to remedy this breach of planning control. The owner has
not willingly complied with requests to remedy the breach which is
why a formal Notice is required now.
Publication date: 10/01/2025
Date of decision: 07/01/2025
Accompanying Documents:
- Breach of Condition Notice PDF 364 KB
- Breach of Condition Notice